X 1623293 13 03 REV 01 SNEFERU EDC LIFTING HANDLING & STOWING FIXATION POINTS .pdf



Nom original: X-1623293-13-03 REV 01 SNEFERU EDC LIFTING_HANDLING & STOWING FIXATION POINTS.pdf
Titre: Microsoft Word - X-1623293-13-03 REV 01 DRAFT SNEFERU EDC LIFTING_HANDLING & STOWING FIXATION POINTS.docx
Auteur: biencourtjc

Ce document au format PDF 1.4 a été généré par PScript5.dll Version 5.2.2 / GPL Ghostscript 8.15, et a été envoyé sur fichier-pdf.fr le 20/07/2012 à 18:04, depuis l'adresse IP 217.108.x.x. La présente page de téléchargement du fichier a été vue 1352 fois.
Taille du document: 26.2 Mo (25 pages).
Confidentialité: fichier public




Télécharger le fichier (PDF)









Aperçu du document


SNEFERU EDC
4.1/16’’ API 15K X 4.1/16’’ API 10K
CHOKE & KILL MANIFOLD

LIFTING INSTRUCTION, HANDLING AND
STOWING FIXATION POINTS
TO INSTALL MANIFOLD INTO
ANTONOV 124

- BEZIERS SALES ORDER 2148616
- ASSEMBLY P/N 239502-14-86-16
- ASSEMBLY DRAWINGS:
- SK-032434-45-07
- SK-032433-45-07
- SK-032432-45-07

JCB X-163293-13-03 REV 01 JULY 18th 2012

1/25

1- ASSEMBLED MANIFOLD…… ..................................................................................... 3
2- LIFTING INSTRUCTION ON PART 1. …………… ....................................................... 5
3- LIFTING INSTRUCTION ON PART 2………………………........................................... 7
4- LIFTING LUGS DIMMENSION………………………… ................................................. 9
5- HANDLING POINTS ON PART 1…………………………… .........................................10
6- PART 1 FOOT PRINT……………………………………………………………… ............12
7- HANDLING POINTS ON PART 2…………………… ...................................................13
8- PART 2 FOOT PRINT………………………………………………………………… .........16
9- STOWING FIXATION POINTS ON PART 1………………… ......................................17
10- STOWING FIXATION POINTS ON PART 2……………………...................................21

JCB X-163293-13-03 REV 01 JULY 18th 2012

2/25

MANIFOLD
PART 2

1- ASSEMBLED MANIFOLD

MANIFOLD
PART 1

JCB X-163293-13-03 REV 01 JULY 18th 2012

3/25

MANIFOLD
PART 2

MANIFOLD
PART 1

JCB X-163293-13-03 REV 01 JULY 18th 2012

4/25

2- LIFTING INSTRUCTION ON PART 1

JCB X-163293-13-03 REV 01 JULY 18th 2012

5/25

PRE-REQUISITE :
- A Toolbox meeting shall be held to review the following procedure and identify any hazard for the complete operation.
- Before starting any handling, make sure that everything is attached to the main frame, any equipment being not part of the
manifold must be taken off.
- Ensure that any exposed component is protected
- Check each and every lifting point before any lift, take all necessary precautions during the handling by specific personal.
During the handling:
- Keep personnel clear of the lifting area.
On the working area :
- Make sure that the working area is free of debris and clean.
- Make sure that the support beams are well oriented in order to receive the main frame without any deformation.
- Attach the structure by the appropriate fixing devices to the floor, the manifold can be levelled by using shims.
INSTRUCTIONS FOR HANDLING
-Care should be taken during lifting and transportation so that the equipments are not exposed to damage.
The complete CHOKE MANIFOLD Part 1 (certified weight 29000 Kg) should only be lifted up with the lifting points
(4 lifting points) according to the drawing with 4 metallic slings.
SLING PROPERTIES:
Length: 4000 mm Mini ; Qty: 4
Minimum Lifting capacity: 10000 Kg each

JCB X-163293-13-03 REV 01 JULY 18th 2012

6/25

3- LIFTING INSTRUCTION ON PART 2

JCB X-163293-13-03 REV 01 JULY 18th 2012

7/25

PRE-REQUISITE :
- A Toolbox meeting shall be held to review the following procedure and identify any hazard for the complete operation.
- Before starting any handling, make sure that everything is attached to the main frame, any equipment being not part of the
manifold must be taken off.
- Ensure that any exposed component is protected
- Check each and every lifting point before any lift, take all necessary precautions during the handling by specific personal.
During the handling:
- Keep personnel clear of the lifting area.
On the working area :
- Make sure that the working area is free of debris and clean.
- Make sure that the support beams are well oriented in order to receive the main frame without any deformation.
- Attach the structure by the appropriate fixing devices to the floor, the manifold can be levelled by using shims.
INSTRUCTIONS FOR HANDLING
-Care should be taken during lifting and transportation so that the equipments are not exposed to damage.
The complete CHOKE MANIFOLD Part 2 (certified weight 23000 Kg) should only be lifted up with the lifting points
(4 lifting points) according to the drawing with 4 metallic slings.
SLING PROPERTIES:
Length: 4000 mm Mini ; Qty: 4
Minimum Lifting capacity: 8000 Kg each

JCB X-163293-13-03 REV 01 JULY 18th 2012

8/25

4- LIFTING LUGS DIMENSIONS

JCB X-163293-13-03 REV 01 JULY 18th 2012

9/25

5- HANDLING POINTS ON PART 1

NO GRATING
(REOMOVED)
HANDLING POINT TO
MOVE THE MANIFOLD
PART 1 INSIDE OR
OUTSIDE THE
ANTONOV

JCB X-163293-13-03 REV 01 JULY 18th 2012

10/25

HANDLING POINT TO
MOVE THE MANIFOLD
PART 1 INSIDE OR
OUTSIDE THE
ANTONOV

JCB X-163293-13-03 REV 01 JULY 18th 2012

11/25

6- PART 1 FOOT PRINT

JCB X-163293-13-03 REV 01 JULY 18th 2012

12/25

7- HANDLING POINTS ON PART 2

NO GRATING
(REOMOVED)

JCB X-163293-13-03 REV 01 JULY 18th 2012

13/25

HANDLING POINT TO
MOVE THE MANIFOLD
PART 2 INSIDE OR
OUTSIDE THE
ANTONOV

JCB X-163293-13-03 REV 01 JULY 18th 2012

14/25

HANDLING POINT TO
MOVE THE MANIFOLD
PART 2 INSIDE OR
OUTSIDE THE
ANTONOV

JCB X-163293-13-03 REV 01 JULY 18th 2012

15/25

8- PART 2 FOOT PRINT

JCB X-163293-13-03 REV 01 JULY 18th 2012

16/25

9- STOWING FIXATION POINTS ON PART 1

STOWING FIXATION POINT 1
ON MANIFOLD PART 1

JCB X-163293-13-03 REV 01 JULY 18th 2012

17/25

STOWING FIXATION POINT 2
ON MANIFOLD PART 1

JCB X-163293-13-03 REV 01 JULY 18th 2012

18/25

STOWING FIXATION POINT 3
ON MANIFOLD PART 1

JCB X-163293-13-03 REV 01 JULY 18th 2012

19/25

STOWING FIXATION POINT 4
ON MANIFOLD PART 1

JCB X-163293-13-03 REV 01 JULY 18th 2012

20/25

10- STOWING FIXATION POINTS ON PART 2

JCB X-163293-13-03 REV 01 JULY 18th 2012

21/25

STOWING FIXATION POINT 1
ON MANIFOLD PART 2

JCB X-163293-13-03 REV 01 JULY 18th 2012

22/25

LADDER TO BE REMOVED

STOWING FIXATION POINT 2
ON MANIFOLD PART 2

JCB X-163293-13-03 REV 01 JULY 18th 2012

23/25

STOWING FIXATION POINT 3
ON MANIFOLD PART 2

JCB X-163293-13-03 REV 01 JULY 18th 2012

24/25

STOWING FIXATION POINT 4
ON MANIFOLD PART 2

JCB X-163293-13-03 REV 01 JULY 18th 2012

25/25


Documents similaires


Fichier PDF x 1623293 13 03 rev 01 sneferu edc lifting handling stowing fixa
Fichier PDF x 1623293 13 04 rev 01 sneferu edc demande procedure de securisa
Fichier PDF spr5c
Fichier PDF internship description office administrator 1 3
Fichier PDF internship description web developer seo specialist 1 3
Fichier PDF internship marketing administrator researcher 1 3


Sur le même sujet..