Recherche PDF


Cet outil permet de trouver un fichier parmi les documents publics partagés par les utilisateurs de Fichier-PDF.fr.
Dernière mise à jour de la base de données: 05 juin à 03:00 - Environ 380000 fichiers indexés.

Chercher sur fichier-pdf.fr Tous les sites
Afficher résultats par page

Réponses pour «draft»:


Total: 400 résultats - 0.068 secondes

2016-10-11-EC-RISC Rolling plan 2016-2019 100%

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT Directorate B - European mobility network 16/797-DV02 Version EN01 RISC 76 Origin EN 11.10.2016 Status I Railway Interoperability and Safety Committee Draft work programme 2016-2019 The rolling programme in annex fixes the indicative dates for the coming meetings of the Railway Interoperability and Safety Committee and provides an overview of the Committee’s activities, in particular in relation to legislative initiatives on which the Committee’s opinion will be required.

https://www.fichier-pdf.fr/2016/10/17/2016-10-11-ec-risc-rolling-plan-2016-2019/

17/10/2016 www.fichier-pdf.fr


1047753 opt 99%

HITCHING HoRsEs TO GET THE MosT WoRK DoNE Tandem Hitches Eliminate Side Draft The hitches described and recommended here are in actual use on Illinois farms.

https://www.fichier-pdf.fr/2016/12/03/1047753-opt/

03/12/2016 www.fichier-pdf.fr

N0340362 (1) 98%

In paragraph 6 of its report contained in document A/57/639/Add.1 — which was submitted under agenda item 110, entitled “Financial reports and audited financial statements, and reports of the Board of auditors”, the Committee recommends to the General Assembly the adoption of a draft resolution adopted by the Committee without a vote.

https://www.fichier-pdf.fr/2014/07/18/n0340362-1/

18/07/2014 www.fichier-pdf.fr

2012-05-22 Circular updatepractice rules 96%

  ‐ ‐ ‐ The first phase is the  triggering of the update by  stakeholders’ feedback.   The second is the  preparation of the draft  Guidelines by the Office.  This phase produces the  draft Guidelines after a  three‐step internal process  (ANALYSE, DRAFT and DISCUSS).  OHIM President Users Final Guidelines OHIM Analyze AB IP NOs Users Draft OHIM draft Guidelines The third phase leads to the  OHIM Translate discuss adoption of the Guidelines  in four steps: TRANSLATE,  CONSULT (the users associations, the EU National IP Offices and the Office’s Administrative  Board) and ADOPT, where the President of the Office adopts the new Guidelines.  The figure on the right illustrates these phases and steps.  As new issues constantly emerge from case‐law regarding operational or stakeholder needs,  the process for revising the Guidelines re‐starts immediately after their adoption.   In order to balance the work evenly over the year, we have divided the Office’s practice into  two working packages (see table in Annex 1):  • the process for reviewing practice items included in work package 1 (WP1) starts  every January with a view to having (partially) updated Guidelines by December of  the same year;  • the process for reviewing items in work package 2 (WP2) starts every July in order to  have (partially) updated Guidelines by June of the following year.  Since these work packages will be known to all our stakeholders and, in particular, to our  users, they can arrange well in advance to submit their feedback and/or comments to the  Office in order to have their issues dealt with during the revision process.    2 3. THE PHASES IN DETAIL  Users OHIM President Users Final Guidelines OHIM Analyze AB IP NOs Users OHIM draft Draft Guidelines 3.1. Phase one: User’s feedback  Translate OHIM discuss As outlined above, the Office will inform our users of the plan to revise our practice by  making public (a) the subject of future revisions (i.e. the two work packages in Annex 1) and  (b) the timing (i.e. by indicating that WP1 will be revised as of January and WP2 as of July).  The Office will thus invite its external stakeholders to send us their comments or feedback  before January (for WP1) and July (for WP2) respectively. Even if the comments or feedback  are not received “on time” (before January/July respectively), they will still be taken on  board in the next cycle.  In fact, users’ comments and feedback are welcome at any moment without being subject to  any time constraints because this is a cyclical process. Regardless of when the comments  reach us, we will take them on board in the next iteration.  Further, regular exchanges of views between the Office and the users’ associations over the  year will ensure that users’ positions are fed into process on a regular basis but without  unnecessary time constraints.  Finally, as the draft Guidelines will also be submitted to the Administrative Board, users can  also present their positions at the Administrative Board.    Draft Guidelines OHIM President Users Users Final Guidelines OHIM Analyze AB IP NOs Users OHIM draft Draft Guidelines 3.2. Phase two: preparation of the draft Guidelines  Translate OHIM discuss The process for updating the Office’s practice starts each year in January and July with WP1  and WP2 respectively. Feedback and comments received from the users submitted in  advance will be considered.  Every January (for WP1 items) and July (for WP2 items), OHIM’s cross‐departmental teams  (the so‐called Knowledge Circles) will produce the new draft Guidelines.  In order to make that possible, different steps must be completed in a timely manner, these  are: ANALYSE, DRAFT and DISCUSS.  In the first phase, ANALYSE, the Knowledge Circles will extract trends from the case‐law of the  General Court, the Court of Justice and the Boards of Appeal of the previous years, analyse  the results of the convergence projects between OHIM and the EU IP Offices and consider  any feedback or comments received from our users and internal stakeholders.  3 On the basis of this analysis, we will launch the second phase, DRAFT, where the Knowledge  Circles will produce a number of updated sections of the Guidelines. Normally, these two  phases, ANALYSE and DRAFT, should be completed in eight weeks.  The third phase, DISCUSS, is an internal discussion: the new texts will be sent for consultation  between the different units and departments affected by the updates. Meetings and  presentations will be held and discussions will take place. The goal is that any department  affected by the update expresses its views. As a consequence of these discussions, the  original texts will usually be revised and, sometimes, even sent for an additional round of  discussions. This may take up to eight additional weeks.  At the end of this process, the Knowledge Circles will have produced new draft Guidelines by  June (for WP1 items) and December (for WP2 items) these draft Guidelines will be published  on the Office’s website.  OHIM President Users Guidelines  adopted Final Guidelines OHIM Analyze AB IP NOs Users OHIM draft Draft Guidelines 3.3. Phase three: adoption of the updated Guidelines  Translate OHIM discuss The draft Guidelines will then be sent for translation into the five languages of the Office.  Once the translations are ready, they will be circulated amongst the user associations, the  EU IP offices and the BOIP with a view to getting their feedback for the next meeting of the  Administrative Board (AB). After consulting the AB, the President will adopt the updated  Guidelines.

https://www.fichier-pdf.fr/2012/06/08/2012-05-22-circular-updatepractice-rules/

08/06/2012 www.fichier-pdf.fr

Draft limité MBP 95%

Draft limité v0,1 29/11/16 Le mode draft limité est une règle optionnelle pour établire en début de partie le nombre et le type d'unités disponiblent pour la draft.

https://www.fichier-pdf.fr/2016/11/29/draft-limite-mbp/

29/11/2016 www.fichier-pdf.fr

6-Simple-Steps-for-Writing-a-Research-Paper 92%

Write a Draft Now that you have organized your research material, the next step will be writing the first draft.

https://www.fichier-pdf.fr/2017/03/11/6-simple-steps-for-writing-a-research-paper/

11/03/2017 www.fichier-pdf.fr

jsc120003 2526 2533 (1) 90%

A draft definition proposed 3 mutually exclusive categories of ARDS based on degree of hypoxemia:

https://www.fichier-pdf.fr/2013/01/30/jsc120003-2526-2533-1/

30/01/2013 www.fichier-pdf.fr

N0341616 90%

Agenda item 10 (continued) Report of the Secretary-General on the work of the Organization Draft resolution (A/57/L.79) The President:

https://www.fichier-pdf.fr/2014/07/18/n0341616/

18/07/2014 www.fichier-pdf.fr

EC740 Simple Hitches for Farm Use 89%

Trena~r Side draft is probably th~ thing which caus es the most dif f i culty in the .ope ration of some farm ·machinery, provided the machinery itself is i~ good condition ar~ pro per adjus tment.

https://www.fichier-pdf.fr/2016/12/03/ec740-simple-hitches-for-farm-use/

03/12/2016 www.fichier-pdf.fr

Item 01 - AG79EN01 - Draft agenda 87%

« CCAB » Building – Meeting Room – 4B Rue Froissart 36, Brussels Draft CONSOLIDATED AGENDA JOINT RISC MEETING AND RADIO SPECTRUM COMMITTEE Tuesday 4 July 2017 (from 14:30 to 17:30) 1.

https://www.fichier-pdf.fr/2017/06/02/item-01-ag79en01-draft-agenda/

02/06/2017 www.fichier-pdf.fr

2012 Code national 124 87%

Code National de la Faluche - edition 124 - Version Draft en attente de CR Écrit par ID Mercredi, 28 Septembre 2011 10:36 - Mis à jour Jeudi, 12 Juillet 2012 13:21 Version 124 - Version draft (en attente de CR) D'après les décisions des Grands Maitres, lors :

https://www.fichier-pdf.fr/2014/05/25/2012-code-national-124/

25/05/2014 www.fichier-pdf.fr

N0349976 87%

Agenda item 10 (continued) Report of the Secretary-General on the work of the Organization Draft resolution A/57/L.83/Rev.1 The President:

https://www.fichier-pdf.fr/2014/07/18/n0349976/

18/07/2014 www.fichier-pdf.fr

UN RIAS RIAS Programme June 2016 86%

United Nations Development Programme Office of Audit and Investigations UN RIAS/ RIAS 2016 Programme preparation June 2016 1 UN RIAS- Programme (Draft) Day 0 Monday 05 September 2016 17:00 – 19:00 Day 1 Welcoming cocktail Tuesday 06 September 2016 08:00 - 09:00 Registration for UNRIAS 09:00 - 09:25 Introductions and welcome to UN RIAS meeting 09:30 – 10:00 Key note speaker 10:00 - 10:30 Coffee break 1 &

https://www.fichier-pdf.fr/2016/06/23/un-rias-rias-programme-june-2016/

23/06/2016 www.fichier-pdf.fr

UN RIAS RIAS Programme DRAFT 86%

United Nations Development Programme Office of Audit and Investigations UN RIAS/ RIAS 2016 Programme preparation May 2016 1 UN RIAS- Programme (Draft) Day 0 Monday 05 September 2016 17:00 – 19:00 Day 1 Welcoming cocktail Tuesday 06 September 2016 08:00 - 09:00 Registration for UNRIAS 09:00 - 09:25 Introductions and welcome to UN RIAS meeting 09:30 – 10:00 Key note speaker 10:00 - 10:30 Coffee break 1 &

https://www.fichier-pdf.fr/2016/06/07/un-rias-rias-programme-draft/

07/06/2016 www.fichier-pdf.fr

WALTHER MARS 2018 ACCESSOIRES 1 85%

Underset Shank w/#242 Draft Gear Boxes 2 Pair Reg.

https://www.fichier-pdf.fr/2018/03/13/walther-mars-2018-accessoires-1/

13/03/2018 www.fichier-pdf.fr

01.16.12 ASA Comments - 8130.21H 84%

FAA Draft Order 8130.21H Procedures for Completion and Use of the Authorized Release Certificate, FAA Form 8130-3, Airworthiness Approval Tag Comments on the Draft Order published online for public comment Submitted to the FAA via email at grant.schneemann@faa.gov Submitted by the Aviation Suppliers Association 2233 Wisconsin Ave, NW, Suite 503 Washington, DC 20007 For more information, please contact:

https://www.fichier-pdf.fr/2014/08/29/01-16-12-asa-comments-8130-21h/

29/08/2014 www.fichier-pdf.fr

UN RIAS RIAS Programme 22 Aug 2016 84%

United Nations Development Programme Office of Audit and Investigations UN RIAS/ RIAS 2016 Programme (draft) 22 August 2016 1 UN RIAS Programme (Draft) Day 1 Tuesday 06 September 2016 Main Speaker Moderator* Panelists Main Room:

https://www.fichier-pdf.fr/2016/08/23/un-rias-rias-programme-22-aug-2016/

23/08/2016 www.fichier-pdf.fr

REVISED Timing TRAN 2016-06-15 83%

COMMITTEE ON TRANSPORT AND TOURISM THE SECRETARIAT 31.05.2016 REVISED PROVISIONAL TIMING Meeting of 15 June 2016, Brussels JAN 6Q2 15.06.2016 Chairman/WG 1 Adoption of draft agenda 2 Approval of minutes of 25-26 April, 12 and 23-24 May meetings 3 Announcement by the Chair 4 Exchange of views on professional qualification in inland navigation 09.10-10.30 Meissner/DRJ 5 Scrutiny of Commission implementing powers:

https://www.fichier-pdf.fr/2016/06/03/revised-timing-tran-2016-06-15/

03/06/2016 www.fichier-pdf.fr

Draft calendar key dates budget 83%

21-24 November Presentation of draft report on Parliament's guidelines in BUDG committee Deadline for amendments to the EP guidelines report Adoption by the Council of conclusions on the 2016 budget guidelines Adoption of EP Guidelines in BUDG committee Adoption by the EP of the resolution on the general guidelines for the 2017 budget (Section III) in Plenary Trilogue ahead of the presentation of the Draft Budget Deadline for tabling indicative pilot projects and preparatory actions (PP-PAs) proposals for pre-assessment by the Commission Presentation of the Commission's Statement of estimates 2017 in the BUDG Committee Deadline for opinions from other committees to the mandate report Presentation of the recommendation for the trilogue during BUDG coordinators meeting Exchange of views on PP-PAs in BUDG Adoption of Council’s position on DB in Coreper Presentation of WD on Council position in BUDG committee Trilogue in Council’s premises Deadline for tabling budgetary amendments:

https://www.fichier-pdf.fr/2016/10/13/draft-calendar-key-dates-budget/

13/10/2016 www.fichier-pdf.fr

Sans nom 1 83%

PRICES EMOTES - 10€ - Free revision during « draft » process - Additional fees for revisions during final process You will recive :

https://www.fichier-pdf.fr/2016/12/31/sans-nom-1/

31/12/2016 www.fichier-pdf.fr

informations (1) 83%

For each modification I'll send you a new draft until you're okay with it 2.

https://www.fichier-pdf.fr/2017/01/09/informations-1/

09/01/2017 www.fichier-pdf.fr

informations 83%

For each modification I'll send you a new draft until you're okay with it 2.

https://www.fichier-pdf.fr/2017/01/09/informations/

09/01/2017 www.fichier-pdf.fr

UN RIAS RIAS Programme 28 Aug 2016[2] 83%

United Nations Development Programme Office of Audit and Investigations UN RIAS/ RIAS 2016 Programme (draft) 28 August 2016 1 UN RIAS Programme (Draft) Day 1 Tuesday 06 September 2016 Main Speaker Moderator* Panelists Main Room:

https://www.fichier-pdf.fr/2016/08/29/un-rias-rias-programme-28-aug-2016-2/

29/08/2016 www.fichier-pdf.fr

UN RIAS RIAS Programme 26 Aug 2016 83%

United Nations Development Programme Office of Audit and Investigations UN RIAS/ RIAS 2016 Programme (draft) 26 August 2016 1 UN RIAS Programme (Draft) Day 1 Tuesday 06 September 2016 Main Speaker Moderator* Panelists Main Room:

https://www.fichier-pdf.fr/2016/08/26/un-rias-rias-programme-26-aug-2016/

26/08/2016 www.fichier-pdf.fr

UN RIAS RIAS Programme 29 Aug 2016[1] 83%

United Nations Development Programme Office of Audit and Investigations UN RIAS/ RIAS 2016 Programme (draft) 29 August 2016 1 UN RIAS Programme (Draft) Day 1 Tuesday 06 September 2016 Main Speaker Moderator* Panelists Main Room:

https://www.fichier-pdf.fr/2016/08/29/un-rias-rias-programme-29-aug-2016-1/

29/08/2016 www.fichier-pdf.fr